Manufacturing Process

Production Process

Ten key processes: the first three determine the material, the middle four the dimensions, and the last three whether it can leave the plant.

Ten key processes

Every process has work instructions, inspection items and an owner; key parameters are recorded for batch traceability.

Stage 1

Material forming

Steps 1–3 · Material
01

Incoming material inspection

IQC

Nylon pellets, rubber compounds, reinforcing yarn, metal fittings and seals are inspected batch by batch, checking material certificates and performance indicators; rejected batches are returned and recorded.

02

Formulation & batching

Batching

Formulation and batching follow product performance requirements, with batch numbers and ratios recorded so material batches stay traceable.

03

Tube extrusion

Extrusion

Multi-layer co-extrusion or rubber extrusion, with in-line monitoring of wall thickness, outer diameter and concentricity to keep the blank dimensionally stable.

Stage 2

Dimensional forming

Steps 4–7 · Dimension
04

Reinforcement & vulcanisation

Reinforce & Cure

After braided reinforcement, rubber hoses are vulcanised at high temperature with controlled temperature and time curves, ensuring cross-linking and pressure resistance.

05

End forming & over-moulding

End Forming

Over-moulding, flaring and end forming ensure fitting bond strength and sealing-face accuracy.

06

Bending & cut-to-length

Bending & Cutting

Automatic bending and cut-to-length follow the 3D model; bend angle and length are checked against the drawing, and out-of-tolerance parts are segregated.

07

Assembly & crimping

Assembly

Hoses, fittings, clips, brackets and quick-connect features are assembled and crimped, verified in line with dedicated gauges.

Stage 3

Testing & delivery

Steps 8–10 · Delivery
08

Performance testing

Testing

Burst, tensile, airtightness and current tests are performed per the sampling plan, with records issued.

09

Final inspection & packing

OQC

Appearance, markings, specification and packing quantities are checked item by item, with a certificate of conformity and batch traceability code attached.

10

Warehousing & delivery

Delivery

Shipped in batches per order, supporting both domestic OEM supply and export customs packing requirements.

Three quality gates

From incoming materials to finished goods, specialists control every stage.

IQC

Incoming material inspection

Material certificates and key performance indicators are verified, samples kept per batch, and rejected batches isolated and returned — controlling quality risk at the source.

IPQC

In-process patrol control

First-article and patrol checks cover wall thickness, outer diameter, bend angle and crimp dimensions; if out of tolerance, we stop and adjust immediately and trace parts already processed.

OQC

Final inspection before shipment

Airtightness, burst and other performance tests are sampled batch by batch; markings and packing quantities are checked, and goods are released with a certificate of conformity.

Process capability matrix

Key processes and inspection items for each product series are listed below, so customers can quickly judge whether a requirement falls within our capability.

Single/multi-layer nylon tube assembliesCo-extrusion · bending · quick-connect assembly · airtightness/burst
High-temperature fluorine brake hose assembliesExtrusion · braided reinforcement · vulcanisation · crimping · burst/airtightness
Silicone hoses / air-conditioning linesExtrusion · vulcanisation · cut-to-length · tensile/airtightness
Electrically heated urea linesAssembly · circuit connection · current testing · airtightness testing
Resin hydraulic high-pressure steel-wire hosesSpiral reinforcement · crimping · high-pressure burst · impulse durability
Fluoroplastic lines and assembliesExtrusion · end forming · assembly · airtightness

The table shows our standard process route; specific projects may add inspection items or adjust steps per the agreed technical protocol.