Skip to main content
Technology

Technology

We stand on three legs — materials, tooling and process. The more steps we control ourselves, the more certain our delivery.

R&D and process workshopProcess validation

In-house capability from material to assembly

We have spent 18 years designing and developing automotive nylon tube assemblies and rubber hoses, with 25 technology patents granted. We can design and develop over-moulding, bending and quick-connect assembly tools plus fixtures and gauges.

25
technology patents
18yrs
years of design & development
30-45days
new-product development cycle
4types
core testing capabilities

Six core technology areas

Process capability is built item by item around five constraints: medium, temperature, pressure, service life and installation space.

TECH 01

Material formulation & modification

Formulation capability across nylon (PA6/PA12), fluoroelastomer, silicone and EPDM systems, matching materials to temperature, medium and service-life requirements.

TECH 02

Multi-layer composites & co-extrusion

Imported five-layer co-extrusion lines form the barrier, reinforcement and outer layers in one pass, balancing pressure resistance with permeation resistance.

TECH 03

Braided reinforcement & vulcanisation

Multi-layer braided reinforcement design for rubber hoses, combined with high-temperature vulcanisation, ensures pressure, temperature and fatigue performance.

TECH 04

In-house tooling development

Over-moulding, bending and quick-connect assembly tools plus fixtures and gauges are designed and built entirely in house.

TECH 05

Assembly processes

Assembly and positioning design for clips, brackets, fittings and quick-connect features, supporting integrated delivery of hose, fitting and seal.

TECH 06

Electric heating & thermal management

Design of electrically heated urea lines and battery/motor/controller cooling lines, solving reliability issues in low-temperature crystallisation and heat dissipation.

New-product development process

Standard projects go from requirement confirmation to sample delivery in 30–45 days, responding quickly to customised development needs.

Stage 1

Design & development

Steps 1–3 · Design
01

Technical input & feasibility assessment

Input

We receive the OEM technical protocol and 3D model, assessing medium compatibility, operating temperature and pressure, bend radius and assembly space.

02

Structure & material design

Design

We define the number of hose layers, reinforcement structure, fitting type and material formulation, and issue the DFMEA and key-characteristics list.

03

Tooling & fixture development

Tooling

Bending, over-moulding and quick-connect assembly tools plus gauges are designed and built in house, with work instructions prepared in parallel.

Stage 2

Validation & ramp-up

Steps 4–6 · Verify & Ramp
04

Sample build & performance validation

Validation

Burst, tensile, airtightness and current tests plus vehicle installation validation are completed, with test reports and sample approval documents issued.

05

Pilot run & process capability confirmation

Pilot Run

We validate takt time, process capability indices and the inspection plan, and submit the PPAP package for customer review.

06

Volume delivery & continuous improvement

SOP

Volume supply from automated lines, with batch traceability and change management in place, continuously optimising process and cost.

Patent portfolio & in-house laboratory

25 hose-related technology patents cover material formulations, forming processes and assembly structures. A full in-house testing laboratory with professional equipment and staff closes the R&D–validation loop.

  • Patent coverageMaterial formulation / forming process / assembly structure
  • Testing capabilityBurst, tensile, airtightness and current testing
  • Closed-loop mechanismR&D data feeds back into processes, and process improvements feed formulation iteration
Technology patent certificate
Technology patent certificate
Technology patent certificate
Technology patent certificate
Technology patent certificate
Technology patent certificate

These are some of the patent certificates; see the complete list of 25 on the Certifications page.

Need a hose solution or custom development?

Tell us your vehicle model, operating conditions and annual volume — we will reply with a selection and quotation proposal within one working day.